Browse all practice questions for the Work Center Supervisor Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Ace Your Work Center Supervisor Exam 2026 – Lead with Confidence and Style! course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • What is the maximum number of Quarters a cycle board can be used for?
  • What is the primary focus of the Afloat Safety Manual (5100.19E)?
  • How is a Job Sequence Number (JSN) created in OMMS-NG?
  • What form is used for Report of Discrepancy (ROD)?
  • What does a solid blue line through the MR signify during IEM status?
  • What does OPNAVINST 4790.4 (Series) refer to?
  • What does the unit of issue "PK" stand for?
  • According to OPNAVINST 4790.4, what is the maximum number of hours a single EGL should contain?
  • In which document would you find the information about HAZMAT PPE?
  • What does the term "remain in place item" suggest?
  • Which group oversees the development and implementation of maintenance procedures on board?
  • How many types of CASREPs exist?
  • A list or repair parts and special tools required for the operation, overhaul and repair of equipment and components can be found in?
  • What does DLR stand for?
  • While reviewing your Quarterly PMS Schedule you notice S-1(), if anything, what does this signify?
  • Which of the following reasons could allow for a Force Revision?
  • Can parts be ordered under an AEL without Department Head approval?
  • What does the term "CASREP" stand for?
  • What does the term 'divisional readiness' refer to in shipboard management?
  • Where should the CASREP DTG and Serial be documented when submitting a 2K in OMMS-NG with a priority of Highly Desirable, Essential, or Mandatory?
  • What is the maximum periodicity of a weekly (W) MRC?
  • How frequently should PMS check 6641/005 M-9R be carried out?
  • In SKED, what does M-1(#R-1) signify on the quarterly board?
  • What does the acronym IEM stand for?
  • Which mode must SKED be in to mark a check as complete?
  • Which item is not included in the LOEP?
  • What type of CASREP report is submitted when a system has been restored to full operational status?
  • What is the purpose of a Quality Deficiency Report?
  • In the context of the 3-M System, what does PMS stand for?
  • The purpose of a Tag out Audit is primarily to ensure what?
  • Who is designated as the Ship's 3-M Manager?
  • What must be done before starting maintenance on equipment?
  • Which document is crucial for reporting supply discrepancies?
  • What form is used for Mandatory Turn-in?
  • Who is required to review and sign the accountability log?
  • How often is a Force Revision (FR) typically produced?
  • What indicates the end of IEM status on a schedule?
  • What is the primary purpose of the LOEP?
  • How often are Danger and Caution Tag out Audits conducted?
  • Which of the following is a responsibility of the Work Center Supervisor?
  • What does the statement "MR was satisfied by a higher level test" imply?
  • What is indicated by a periodicity marking of 1M?
  • What term describes the mandatory checks and tasks to maintain equipment functionality within the 3-M system?
  • What should a Maintenance Person do if they find an MRC that they do not understand?
  • Which CASREP category is not required for a job priority classified as Essential?
  • What type of item does the "Non-Maint Supplies" menu typically encompass?
  • What is chapter C23 in the Afloat Safety Manual?
  • Which of the following is true about rescheduling maintenance tasks?
  • When using Open Purchase, what is the maximum dollar amount allowed for a single request?
  • Where can the ships underway schedule be viewed?
  • What is the primary purpose of the PMS (Planned Maintenance System)?
  • PMS schedules (boards) are produced using what computer program?
  • If A-1 MRC is completed but Q-1 must be rescheduled, how should this be handled?
  • What type of maintenance task must be marked as complete in SKED?
  • What does a "C" beside a MIP number on the LOEP indicate?
  • How often and based on what document is the Quarterly Board updated?
  • Which piece of information is NOT included in the List Of Effective Pages (LOEP)?
  • What symbol indicates mandatory maintenance is required and must be accomplished concurrently?
  • Which state does a monthly MR reach once it is scheduled?
  • What does OPNAVINST 5100.19 (Series) pertain to?
  • What is the maximum periodicity of a 2W MRC?
  • Which document is NOT part of the routine PMS protocol?
  • What is the primary purpose of the 3-M System?
  • What form is utilized to report discrepancies or deficiencies in the PMS system?
  • If a MRC has a periodicity of 2M, how often should it be accomplished?
  • Is it true that the independent reviewer only needs to be familiar with the equipment being tagged to sign the Tag Sheet?
  • How is the start of IEM indicated on the Quarterly board?
  • What does the cent sign (¢) signify about a specific MR on the Quarterly board?
  • From the MRC SYSCOM CONTROL NO "S 24 DWYG N", what can be inferred about the MRC?
  • Which term refers to the time needed to perform required maintenance activities?
  • Can a work center receive credit for a PMS check if at least 80% of the check is completed?
  • What is the minimum information required when entering a 2K in OMMS-NG?
  • What is the primary purpose of the Quarterly board?
  • How many weeks does a Quarterly board cover?
  • The Ship's 3-M system is designed to provide for managing maintenance and maintenance support to achieve ____________ equipment operational readiness?
  • Is the RPPO responsible for maintaining a Work Center RPPO log?
  • The Department Head finalizing the Cycle board constitutes the approval signature. Is this statement true or false?
  • Who holds ultimate responsibility for the effective functioning of the 3-M system within the command?
  • Who has the authority to mark the Weekly PMS Schedule as completed for a PMS check?
  • What is the role of the Commanding Officer concerning PMS?
  • If a job priority in OMMS-NG is categorized as Highly Desirable, what type of CASREP is required?
  • What is the scheduling interval for a quarterly MR?
  • What is one key function of the MRC?
  • Given the information [00883] Tester, 500V, 100MO, SCAT-4452, what number locates the Tester in the SPMIG?
  • Which form is used to document the installation of new equipment?
  • What minimum information is required when entering a 2K in OMMS-NG?
  • Who is responsible for reviewing and signing off on the Weekly PMS Schedule?
  • What is the purpose of a Caution Tag in maintenance operations?
  • What does the acronym MRC stand for in maintenance terminology?
  • Is maintaining a Work Center RPPO log optional?
  • What does "Man-Hours" on the MRC card refer to?
  • What is the purpose of a memo regarding non-accomplished maintenance?
  • What is attached to a MRC and lists identical items at different locations?
  • The SCLSIS database is used to determine which of the following?
  • Who is responsible for notifying the supervisor about tool availability?
  • What is GDAPL?
  • What is the responsibility of the second person during an equipment tag-out procedure?
  • If a question exists regarding a step in a maintenance requirement, what should the Maintenance Person do?
  • Which document contains a list of MIPs assigned to a specific work center?
  • In PMS procedures, what does the acronym PMS stand for?
  • What does a vertical line signify in relation to MIP status?
  • What is a QDR?
  • What does a SCAT code identify?
  • What is the basic rule when signing receipts?
  • When an MRC applies to multiple like equipment, how are they listed to ensure PMS is conducted on each item?
  • What is the function of a "schedule verification" in SKED?
  • What is the production (birth) date of an MRC card with SYSCOM MRC Control Number A7 4ABG N?
  • What is the initial step to create a JSN in OMMS-NG?
  • What is the best way to check the status of parts ordered for your work center?
  • Where can information on proper PPE for using HAZMAT be found?
  • What color is a Classified maintenance requirement card?
  • How frequently should the PMS check 4211/001 Q-6R be performed?
  • An Advance Change Notice (ACN) would be received when?
  • What does the acronym MIP stand for?
  • At what interval can a monthly MR be scheduled?
  • How often should Maintenance Personnel review their MRCs to ensure compliance?
  • To perform an equipment validation, what is the first step you should take?
  • Which of the following is an example of a consumable item ordered through the "Non-Maint Supplies" menu in OMMS?
  • What happens if a maintenance person is not assigned any maintenance check for greater than 3 quarters in SKED?
  • Submitting a 4790/CK for a newly installed piece of equipment will initiate support to include?
  • Who is the Authorizing Officer for an equipment tagout for Engineering while underway?
  • In the "Procedure" block, workcenter supervisors may line out the non-applicable line items (Alternate procedures) that do not pertain to current equipment/configuration when the step is followed with the words "If applicable" or a note identifying steps to be omitted. Is this statement true or false?
  • Which officer is primarily responsible for the safety protocol within the ship's command structure?
  • Who verifies the information entered into the PMS system?
  • What does the "Y" in the SYSCOM CONTROL NO of MIP MRC A-1 signify?
  • When is equipment permitted to be operated with a red tag attached?
  • Who is the final approving authority for the "Remain in Place" (RIP) chit?
  • Once the Quarterly PMS Schedule has been authorized, how often must it be updated?
  • Which of the following is an example of an AEL?
  • Which of the following would be the correct quarter scheduling for the 18M-1 as you are verifying your PMS Schedules that started on the first quarter?
  • Who is designated as the 3-M system functional manager within the command?
  • What is the purpose of a DD Form 200?
  • SNAP II was replaced by which system?
  • Can an EGL contain more than one single day’s work?
  • What is the maximum periodicity of a 3W MRC?
  • What does the acronym RAR stand for?
  • In the context of shipboard operations, what does the term "tagout" refer to?
  • What form is used for Quality Deficiency Report (QDR)?
  • What does MSDS stand for?
  • In the context of work center maintenance, what does PMS stand for?
  • What does the acronym MRC stand for?
  • During what situation would an Initial CASREP typically be filled out?
  • How should changes to parts or materials be handled according to policy?
  • Which of the following is NOT an example of an IEM MRC?
  • For a Danger/Caution tag, when does the second person check the tags?
  • A job priority of Essential in OMMS-NG requires which category of CASREP?
  • What is chapter C1 in the Afloat Safety Manual (5100.19E) primarily about?
  • Shipboard divisions may have E7 and senior who are responsible for multiple Work Centers. These Chief Petty Officers are designated by the Commanding Officer as?
  • What is the significance of the 4790 series form?
  • Which type of maintenance focuses on restoring equipment to operational status after a failure?
  • Which publication or CD-ROM is used for proper identification of parts ordered?
  • What type of documentation assists in improving maintenance policies and procedures?
  • What does the acronym HAZMAT stand for?
  • Which form is utilized for logistical reporting?
  • Which of the following documents is necessary for approving an order under the Open Purchase procedure?
  • Which responsibility does not belong to the Maintenance Person?
  • Which modification is not allowed for MRCs by shipboard personnel?
  • Which action does SKED take for unused maintenance personnel after a specific period?
  • What does the CASREP category indicate for a Highly Desirable job priority?
  • Are weekly Maintenance Requests (MR) displayed on the Quarterly Board?
  • Who is primarily responsible for overseeing the effectiveness of the Planned Maintenance System?
  • What is an MSDS for?
  • What does the dotted red line through the MR indicate?
  • What must you bring to order a DLR?
  • When submitting a 2K with a CASREP, what specific information must be included about the CASREP?
  • Can you share an APL with another work center performing maintenance on the same equipment?
  • What can work center supervisors report through the Maintenance Data System (MDS)?
  • At what interval can an annual Maintenance Review (MR) be scheduled?
  • What is the role of the Division Officer in the context of PMS?
  • For a job classified as Mandatory in OMMS-NG, what category of CASREP must be submitted?
  • How often can a semi-annual MR be scheduled?
  • Is the statement true or false? An OPNAV 4790/CK is used to report discrepancies in the PMS system?
  • Who has final approval on parts over $2,000 but less than $5,000?
  • What does the acronym COSAL stand for?
  • What does 5S refer to in the procurement process?
  • Where do Maintenance Personnel find their PMS assignments?
  • When is equipment placed in IEM Status I?
  • Which document provides instructions and references required for use in the 3-M System?
  • In the context of parts validity, what does 5G indicate?
  • Who is the first individual to sign a DANGER Tag?
  • Equipment should be placed in IEM Status II when...
  • What is required when a maintenance action is not fully accomplished?
  • Which Tag-Out Log would a Supply Department DCPO utilize for a DC related tag-out?
  • What form should be filled out to request a replacement for a lost or damaged classified MRC?
  • What does a blue line through a schedule MR during an IEM period signify?
  • Who typically takes the lead in conducting maintenance training sessions in a work center?
  • Who may authorize Danger/Caution tags?
  • What does the acronym 3M stand for?
  • Is it true that the only requirement for a DC Maintenance Person is to be DC qualified?
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy